Cisco Systems SCE 2000 4xGBE manual Verify that the link LED is green, 6 Cabling the GBE Interface

Models: SCE 2000 4xGBE

1 152
Download 152 pages 7.79 Kb
Page 103
Image 103
Figure 6-6: Cabling the GBE Interface

Chapter 6 Cabling the Line Ports and Completing the Installation

Connecting the line ports to the network

Make sure to push on the connector until you hear a click, which indicates that the connector is fully inserted and secured in the receptacle. Always make sure that you insert the connector completely into the socket.

Figure 6-6: Cabling the GBE Interface

Step 2 Verify that the link LED is green.

If the link LED does not light, try removing the network cable plug and reinserting it firmly into the module socket.

SCE 2000 4xGBE Installation and Configuration Guide

 

OL-7824-02

6-9

 

 

 

Page 103
Image 103
Cisco Systems SCE 2000 4xGBE manual Verify that the link LED is green, 6 Cabling the GBE Interface