Cisco Systems SCE 2000 4xGBE manual

Models: SCE 2000 4xGBE

1 152
Download 152 pages 7.79 Kb
Page 100
Image 100
Inline topologies require connecting both Receive and Transmit fibers to the SCE 2000. Cascade ports always require both Receive and Transmit fibers to be connected.

Chapter 6 Cabling the Line Ports and Completing the Installation

Connecting the line ports to the network

Inline topologies require connecting both Receive and Transmit fibers to the SCE 2000. Cascade ports always require both Receive and Transmit fibers to be connected.

The following diagram illustrates the connections for a dual link, two SCE 2000-platform inline topology.

Figure 6-5: Cabling Diagram: Dual Link Inline Topology Two Cascaded SCE 2000s

SCE 2000 4xGBE Installation and Configuration Guide

6-6

OL-7824-02

 

 

 

 

Page 100
Image 100
Cisco Systems SCE 2000 4xGBE manual