To specify a Soak (within a Move):

Creating a New Wash Protocol

To specify a Soak (within a Move):

Note: A Soak can be performed either within or outside of a Move cycle. The procedure below describes the procedure for specifying a soak within a Move cycle.

The procedure for specifying a Soak outside of a Move cycle is described on page 50.

1. Scroll right to display the next selection. The display will read:

Select option

SOAK FILL

2.Select SOAK. The display will read:

Duration? 5

3.Enter the desired soak duration using the keypad.

Note: A soak duration ranging from 1 to 999 seconds can be entered.

4. Press ENTER The display will read:

Select option

SOAK FILL

Opsys MW™ User’s Guide

51

Page 59
Image 59
Dynex 91000051 manual To specify a Soak within a Move, Creating a New Wash Protocol