Emerson E2 operation manual 16AI Installation Guide

Models: E2

1 273
Download 273 pages 39.74 Kb
Page 78
Image 78

16AI INSTALLATION GUIDE

5

1

4

2 3

1.Connect 16A1 to the RS485 I/O Network.

2.Set the network address on the first five

rockers of dip switch S3.

3. Set the network baud rate using rockers 6 and 7 of dip switch S3.

4. Set RS485 termination jumpers UP (term) if at either end of a daisy chain. Otherwise, set jumpers DOWN (not term).

5. Connect board to the 24VAC center-tappedsecondary of the power transformer.

Note: If you change any dip switch settings 32 while the board is powered, disconnect the

power and re-power the board to reset.

1

 

 

 

 

 

TO

 

 

 

ER

 

TH

5

 

O

 

 

 

48

 

 

RS

ES

 

VIC

 

 

DE

 

 

 

 

 

 

 

T

 

OTHE

O

 

R

DE

RS4

85

VI

 

 

CE

 

 

 

 

S

 

SHIELDED TWISTED PAIR

2

ADDRESS

 

 

 

 

 

 

 

 

3

 

 

 

 

 

BAUD RATE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BELDEN #8761. FOR PLENUM,

1

2

3

4

5

6

7

8

1

2

3

4

5

6 7 8

 

USE BELDEN #82761 OR #88761

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

OR EQUIV.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BOARD 1

 

 

 

 

BOARD 2

 

 

 

 

BOARD 3

 

 

 

 

BOARD 4

 

 

 

 

 

 

 

 

 

1

2

3

4

5

6

7

8

1

2

3

4

5

6

7

8

1

2

3

4

5

6

7

8

1

2

3

4

5

6

7

8

 

 

 

 

 

 

 

ON

 

 

 

 

 

 

 

ON

 

 

 

 

 

 

 

ON

 

 

 

 

 

 

 

ON

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

2

3

4

5

6

7

8

 

 

BOARD 5

 

 

 

 

BOARD 6

 

 

 

 

BOARD 7

 

 

 

 

BOARD 8

 

9600 baud

 

 

 

 

 

 

 

1

2

3

4

5

6

7

8

1

2

3

4

5

6

7

8

1

2

3

4

5

6

7

8

1

2

3

4

5

6

7

8

 

 

 

 

 

 

 

ON

 

 

 

 

 

 

 

ON

 

 

 

 

 

 

 

ON

 

 

 

 

 

 

 

ON

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BOARD 9

 

 

 

BOARD 10

 

 

 

BOARD 11

 

 

BOARD 12

1

2

3

4

5

6

7

8

1

2

3

4

5

6

7

8

1

2

3

4

5

6

7

8

1

2

3

4

5

6

7

8

1

2

3

4

5

6

7

8

 

 

 

 

 

 

 

ON

 

 

 

 

 

 

 

ON

 

 

 

 

 

 

 

ON

 

 

 

 

 

 

 

ON

 

 

 

 

 

 

19200 baud

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

WIRE + to + (same color)

ON

BOARD 13

 

ON

BOARD 14

 

ON

BOARD 15

 

ON

BOARD 16

 

 

1

2

3

4

5

6

7

8

1

2

3

4

5

6

7

8

1

2

3

4

5

6

7

8

1

2

3

4

5

6

7

8

WIRE 0V to 0V

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

WIRE - to - (same color)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4

JU1 JU2 JU3

JU1 JU2 JU3

 

UP

DOWN

 

(Terminated)

(Not Terminated)

(Term)

UP

 

 

DAISY CHAIN CONFIGURATION

SET TERMINATING JUMPERS:

(Term)

DOWN DOWNUP

5

120/208/240 VAC

 

L2

(HOT)

(NEUTRAL)

 

 

L1

240

208

C

 

 

 

120

WIRING FOR 640-0056, 56VA Transformer,

and 640-0080, 80VA Transformer

24VAC Center-Tapped Transformer

Three-conductor non-shielded cables

 

 

 

are the recommended wire

 

 

 

for connecting between the

 

 

 

center-tapped transformer

 

 

 

and I/O boards.

 

 

 

Power Wiring Types:

AC1

0V

AC2

14 AWG

Belden 9495

 

 

 

18 AWG

Belden 9493

 

 

 

 

 

24V

CT

24V

AC1 24VAC Center-Tapped

0V

AC2

Earth ground the

0V (center-tapped) terminal of each board

PRIMARY SIDE

SECONDARY SIDE

6-18 E2 RX/BX/CX I&O Manual

026-1610 Rev 13 14-SEP-2011

Page 78
Image 78
Emerson E2 operation manual 16AI Installation Guide