
FC I/O blade installation | Fibre Channel I/O Blades |
9.7FC I/O Blade Installation
VCAUTION
●Fibre Channel I/O blades must always be installed in slot NET3 first (see page 109).
The installation and removal of FC switch blades takes place in the same way as the installation of Ethernet LAN I/O blades (see section “Installing an
I/O Blade” on page 96).
112 | Operating Manual | BX600 S3 |