Connecting the System to the Mains

Installing the Hardware

4.5Connecting the System to the Mains

There are slots for four hot-swappable2100 W power supply units on the rear of the basic unit. The base system is equipped with two power supply units.

VCAUTION!

Make sure you observe the information on determining how many power supply units are required (see chapter “Power Supply Concept” on page 125).

Due to the high power requirements of the BX600 S3 blade server, you must be careful when arranging the power cabling. Please notice the information that purpose in section “Notes on power cabling” on page 126).

The power supply units switch on automatically at a mains voltage between 200 - 240 V. The basic unit may only be commissioned if the local mains voltage is within the voltage range of the system.

The 2100 W power supply units may only be connected to 16 Amp grounding outlets, a power distribution unit (PDU) or CEE outlets. When ordering the basic unit, indicate the type of outlet available at the installation site. This will allow us to supply a cable with suitable C19 connectors with the order.

46

Operating Manual

BX600 S3

Page 46
Image 46
Fujitsu BX600 S3 manual Connecting the System to the Mains