Fujitsu BX600 S3 manual Removing the I/O Blade, Inserting the I/O blade a = green touch point

Models: BX600 S3

1 164
Download 164 pages 23.01 Kb
Page 99
Image 99

Ethernet I/O Blades

Installing an I/O Blade

 

 

 

 

Figure 49: Inserting the I/O blade (a = green touch point)

ÊPush (1) the I/O blade as far as possible into the desired slot (here slot 2).

ÊSwing up (2) the eject handle (a) of the I/O blade until the locking mechanism of the I/O blade engages.

Removing the I/O Blade

The I/O blade is removed in the same way as the dummy module (see “Removing the Dummy Module” on page 96).

VCAUTION!

Read the safety information and the information on handling electro- static-sensitive components in the section “Components With Electro- static-Sensitive Devices” on page 25.

If you remove the I/O blade and do not replace it with a new one, you must insert a dummy module in the empty slot to ensure cooling, to comply with the appli- cable EMC regulations (regulations on electromagnetic compatibility) and for fire protection.

Make sure that the dummy module engages in the slot correctly.

BX600 S3

Operating Manual

99

Page 99
Image 99
Fujitsu BX600 S3 manual Removing the I/O Blade, Inserting the I/O blade a = green touch point