Hitachi GR2000 manual Computer Main Line Distribution Panel

Models: GR2000

1 410
Download 410 pages 45.58 Kb
Page 299
Image 299

To reduce external magnetic field, note the following in facility construction such main power line and air conditioning:

Do not cross the distribution panel location for the computer system and the primary side main-line cable construction route in the ceiling of the compute room or on the floor. Make the cable route as short as possible when constructing along the wall of the computer room.

The location of the air conditioning control panel and the cable construction

￿route of the primary side main line should be the same as mentioned above.

The main-line cable type must be multi-strand. If you use single-strand cable minimize the distance between cables in each phase.

Computer

Main

Computer

Main

Line

Line

 

 

Distribution

 

 

Distribution

Panel

 

 

Panel

Page 299
Image 299
Hitachi GR2000 manual Computer Main Line Distribution Panel