GR2000-10 (unit: mm). The steps are as follows:

1. Prepare the 19-inch rack, considering the dimensions of the router chassis.

The inner depth of the rack must accommodate the depth of the router chassis plus minimum cable clearance (30mm for interface cables and 70mm for power cables) and minimum airway clearance (30mm). For GR2000-10H and GR2000-10 (depth 600 mm), the inner depth of the rack must be at least 700mm. If a rack with a door is selected, make sure that the distance between the chassis front end and the inner surface of the door satisfies the said minimum cable clearance (30mm).

2. ￿￿Mount the load-bearing guide rail (accessory of the rack) on the rack. Make sure that the guide rail can sustain the mass of the chassis (max. 120kg per GR2000-10H and max. 85kg per GR2000-10). Align the guide rails to support the bottom of the chassis and, if another router is to be mounted above this router, to secure a space of 1U (44.45 mm) or more on top of the router when mounted.

The width of the opening of the rack must accommodate the width of the router chassis plus minimum allowance of 10mm for the thickness of metal brackets to be attached to both sides of the chassis. For GR2000-10H and GR2000-10 (width 440 mm), the width of the opening of the rack must be at least 450mm.

Page 342
Image 342
Hitachi GR2000 manual