Hitachi GR2000 manual Hardware Installation, Xlvi

Models: GR2000

1 410
Download 410 pages 45.58 Kb
Page 46
Image 46

GR2000 Installation Guide

Half-Size NIF Installation Examples

4-18

Example of No. of multicast group

4-25

MPLS Backbone and Access Circuits

4-28

Clock closed-loop prohibition

4-56

Conversion from Ethernet Frame to ATM Cells

4-58

Shaping at Overload

4-59

Next_Hop resolution

4-66

Network Configuration Requiring noinstall for aggregate Definition

4-67

Example for Specifying a nexthopself Parameter

4-69

Configuration to use the device for communication between IPv6 terminals on the same link ... 4-70

Configuration to become object of ICMPv6 re-direct message transmission

4-70

Typical Frame Relay Network with Bridge Connection

4-77

BPDU Frame Format Supported

4-77

Normal QoS Operation

4-79

Failing QoS Operation with Heavy Load on RP

4-80

Failing QoS on ATM Interface (Transmitting Inbound-QoS-Defined Packets onto

 

ATM Interface)

4-80

Network Configuration

4-82

Network patterns applicable to PIM-DM and PIM-SM

4-85

Inapplicable network pattern in PIM-DM

4-86

Applicable PIM-SM network pattern

4-87

Chapter 5 - Installation Site Conditions

5-1

Process of Falling-Dust Measurement

5-2

Main Power Line Examples

5-3

Standard (Non-Redundant) Power Feeding with 100V ac Input

5-7

Redundant Power Feeding with 100V ac Input

5-7

Standard (Non-Redundant) Power Feeding with 200V ac Input

5-8

Redundant Power Feeding with 200V ac Input

5-8

Standard (Non-Redundant) Power Feeding with –48V or –60V dc Input

5-9

Redundant Power Feeding with –48V or –60V dc Input

5-9

Airflow of GR2000-2S

5-13

Airflow of GR2000-10H

5-14

Airflow of GR2000-20H

5-14

Airflow of GR2000-4

5-15

Airflow of GR2000-10

5-15

Airflow of GR2000-20

5-16

Chapter 6 - Hardware Installation

6-1

Unpacking of GR2000-2S

6-1

Unpacking of GR2000-4S

6-2

Unpacking of GR2000-6H

6-3

Unpacking of GR2000-10H

6-4

Unpacking of GR2000-20H

6-5

Unpacking of GR2000-4

6-6

Unpacking of GR2000-10

6-7

Unpacking of GR2000-20

6-8

Unpacking of Separately Shipped RM/RP/NIF Full Size Board

6-9

Unpacking of Separately Shipped NIF Half Size Board

6-9

Unpacking of Separately Shipped Memory Module

6-10

Unpacking of Flash Memory Card (MC)

6-10

Unpacking of Separately Shipped Cable

6-11

Sample Handling of Module on Anti-Static Surface

6-11

 

 

xlvi

GR2K-GA-1002

 

Rev. 6.03

Page 46
Image 46
Hitachi GR2000 manual Hardware Installation, Xlvi