C 9.92

Operating Instructions

Operating the attachments

 

Connecting line for priority flow valves 1 and 2

The oil flow of priority flow valves 1 and 2 can be combined with the connecting line.This will result in a flow rate of 0 to 50 litres/min.

- Set the changeover lever (1) in the area of the articu- lated joint to the up position.

The priority flow valves 1 and 2 are now connected.

-Set the rotary knob for priority flow valve 2 to the max. position. You can set the desired flow rate with the rotary knob for priority flow valve 1.

1

Bild_S 990_030

ATTENTION

If the flow rate selected is higher than intended for the attachment, the attachment can be damaged or people standing in the vicinity can be injured.

-Set the changeover lever (1) to the rear position. The priority flow valves 1 and 2 are now separated.

153 146

115

Page 117
Image 117
Holder C 9.92 H operating instructions Connecting line for priority flow valves 1