|
|
|
|
|
| 4. Inspection | |
|
|
| |||||
|
|
| |||||
|
|
|
|
| |||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
This chapter provides the instructions for regular inspection and overhaul necessary for the prolonged lifetime of robot performance.
4.1. Inspection Item and Period
Inspection is positively necessary to continue and maintain the high performance of robot for
There are daily inspection and regular inspection. [Table
And overhaul every 35,000 operating hours.
The inspection periods have been reviewed for SPOT Welding. In case of high precision work such as handling, it is recommended to inspect at the half intervals of that period as shown in [Table
Table
Yearly Inspection | Yearly Inspection |
|
|
3 months 6 months 9 months 12 months 3 months 6 months 9 months 12 months
3 months 6 months 9 months 1 year | 1 year & | 1 year & | 1 year & | 2 years |
| 3 months | 6 months | 9 months |
|
Daily Inspection