IBM 201 manual Troubleshooting the Remote Supervisor Adapter, v Update System Management firmware

Models: 201

1 140
Download 140 pages 39.72 Kb
Page 87
Image 87

I2C Interface Test:

Passed

Main Application Checksum:

Passed

Boot Sector Checksum:

Passed

Current System Management Adapter Status

Current BIST Results:

 

SRAM Memory Test:

Passed

Serial Port 1 Test :

Passed

Serial Port 2 Test:

Passed

NVRAM Memory Test

Passed

Realtime Clock Test

Passed

Programmable Gate Array Test:

Passed

I2C Interface Test:

Passed

Main Application Checksum:

Passed

Boot Sector Checksum:

Passed

Onboard Ethernet Hardware Test:

Passed

PCI EEPROM Initialization Test:

Passed

5.When you are finished viewing this information, press Esc to return to the main option menu. Remove the CD then restart the NAS 200 engine.

Troubleshooting the Remote Supervisor Adapter

1.Insert the Remote Supervisor Adapter Support CD into the CD-ROM drive and restart the engine. If the engine does not boot from the CD-ROM, use POST/BIOS setup to configure the CD-ROM drive as a boot device.

2.After the engine boots, the main option menu appears. The main menu contains the following selections:

vHardware Status and Information

vConfiguration Settings

vUpdate System Management firmware

3.Use the up and down arrow keys to select Hardware Status and Information and press Enter. The Hardware Status and Information menu contains the list of devices with the following diagnostic test results:

 

System Management Processor Communication

: Passed

->

Built in Self Test Status

: Passed

 

Boot Sector Code Revision ...

:16, Build ID: CNET15A

 

Main Application Code Revision

:16, Build ID: TUET15A

4.Use the up and down arrow keys to select the device you want to look at in more detail. Press Enter. You will see a list of tests and results on the device:

Current System Management Processor Status

Current BIST Results:

 

SRAM Memory Test:

Passed

Serial Port 1 Test :

Passed

Serial Port 2 Test:

Passed

NVRAM Memory Test

Passed

Realtime Clock Test

Passed

Programmable Gate Array Test:

Passed

I2C Interface Test:

Passed

Main Application Checksum:

Passed

Boot Sector Checksum:

Passed

Current System Management Adapter Status

Current BIST Results:

 

SRAM Memory Test:

Passed

Serial Port 1 Test :

Passed

Serial Port 2 Test:

Passed

NVRAM Memory Test

Passed

Realtime Clock Test

Passed

Chapter 7. Troubleshooting 75

Page 87
Image 87
IBM 201 manual Troubleshooting the Remote Supervisor Adapter, v Hardware Status and Information v Configuration Settings