IBM DR550 manual Attach the Rack to a Concrete Floor Beneath a Raised Floor

Models: DR550

1 128
Download 128 pages 56.42 Kb
Page 3
Image 3

IBM System Storage DR550

Version 3.0 ------

17 March 2006

Page 3

INSTALLATION AND ACTIVATION

 

30

Safety Notices

 

30

Site Preparation and Planning

 

31

Unpacking and Installing the Rack(s)

 

32

Positioning the Rack

 

32

Leveling the Rack

 

32

Attaching the Rack to a Concrete Floor

 

33

Attach the Rack to a Concrete Floor Beneath a Raised Floor

36

Connecting the Racks in a Suite (applies only to dual node 89.6 TB Configuration)

38

Cabling between the Racks

 

40

Cabling to the customer’s Ethernet / IP Network

41

Single Node Configurations

 

41

Dual Node Configurations

 

43

Setting up the Management Console

 

44

Userid and Password

 

44

Changing Server Names

 

44

Connecting AC Power

 

47

Configuring the P5 520 Servers

 

49

User Accounts

 

49

Connecting to Gigabit Ethernet (Fibre) Network

50

Connecting to a 10/100/1000 Mbps Ethernet (copper) Network

51

Procedure for Changing IP Address

 

53

Configuring the Dual Node System (P5 520 Servers)

55

Connecting to Gigabit Ethernet (Fibre) Network

56

Connecting to 10/100/1000 Ethernet (Copper) Network

58

HACMP Configuration

 

59

Procedures for Changing IP Addresses

 

59

Cluster Snapshot

 

72

REMOTE MIRRORING

 

74

Zoning diagrams (single and dual node)

 

74

Setting up DR550 for remote mirroring

 

77

Recovery from the primary failure

 

78

Setting up DR550 for mirroring back to original site

80

OTHER INSTALLATION TOPICS

 

81

Changing passwords

 

81

IBM Storage Systems

Copyright © 2006 by International Business Machines Corporation

Page 3
Image 3