Product Description

1.4.3Positioning the Liebert XDC with Floor Stand

Install the Liebert XDC according to the site-specific documentation and secure the unit to the floor.

The Liebert XDC can be installed near a wall or another Liebert XDC. There must be at least 3 feet (914mm) clearance in front of the Liebert XDC for service access. When the Liebert XDC is combined with the optional water/glycol floor stand, Liebert recommends leaving 3 feet (914mm) of clearance on the left side of the unit.

A Liebert XDC on a floor stand is 102 inches (2591 mm) high (see Figure 9). The unit can be raised or lowered 1.5 inches (38.1 mm) with the leveling feet.

Figure 9 Dimensions and clearances for Liebert XDC on floor stand

78"

(1981mm)

102"

(2591mm)

24" Nominal 610 mm

Shaded areas indicate a recommended cleareance of 36" (914mm) for component access and water/glycol piping.

9

Page 15
Image 15
Liebert Positioning the Liebert XDC with Floor Stand, Dimensions and clearances for Liebert XDC on floor stand