Piping and Filling with Refrigerant:
Figure 24 Installation data—Lee-Temp, one-circuit, four-fan model
|
|
|
|
| |||
|
|
|
|
| accordance with local codes or main unit | ||
|
|
|
|
| switch ordered as optional equipment | ||
|
|
|
|
| |||
|
|
|
|
| * Liquid line from | ||
|
|
|
|
| condenser (Circuit 1) | ||
4 |
|
|
|
|
|
| |
6 |
|
|
| See |
|
| |
See |
|
|
|
|
| ||
|
|
| Note 14 |
| |||
Note 12 | * Hot Gas Line |
|
|
| |||
|
|
|
|
| |||
|
|
|
|
|
| ||
| From Unit |
|
|
|
|
| |
| (Circuit 1) |
|
|
|
|
| |
|
|
|
|
|
| Electrical service | |
|
|
|
|
| by others | ||
|
|
|
|
|
| ||
| pad electric box |
|
|
|
|
| |
Mounting Instructions | this end (See Page 3) |
|
|
|
| Hot Gas Line (Circuit 1) | |
|
|
|
| See Note 14 | Liquid Line (Circuit 1) See Note 14 | ||
1. Uncrate carton and inspect for damage to* Hot Gas Line to |
|
| Liquid Return | Ensure piping stays below electrical | |||
condenser and condenser control panel. Condenser (Circuit 1) | A |
| box and does not protrude | ||||
D | Line to Unit | ||||||
2. Assemble legs per instructions as shown. |
| Metal | |||||
Position elbow to direct | (Circuit 1) | ||||||
3. Double risers are required when hot gas | relief valve downward |
| Clamp | ||||
vertical rise is 15 feet (4.6m) or more |
|
|
|
| Isolator | ||
|
|
|
| Note 14 | |||
(see 2.6 Install Double Discharge Risers). |
|
|
|
| |||
4. Wire according to electrical diagram on inside |
| MATERIALS SUPPLIED |
| ||||
of condenser control box and in accordance with |
|
| |||||
| BY EMERSON NETWORK POWER | ||||||
all local codes. |
|
| 1 | ||||
5. All condenser locations more than 200ft. (61m) of |
| ||||||
|
| for details and field wiring. | |||||
equivalent piping length away from Liebert XDC |
|
| |||||
must consult factory for special piping considerations. | 2 | ||||||
6. Field to size refrigerant lines so as not to exceed |
| 3 | Piping access cover to be reinstalled when piping is completed. | ||||
2°F (1.1°C) saturation loss for total equivalent length | 4 Bolts - (4 per leg) 3/8" (9. 5mm) - (16) sixteen 5/8" (15.9mm) | ||||||
(do not use connection sizes to determine line sizes). | |||||||
5 | Terminal block for | ||||||
7. Condenser installation is limited to a maximum of |
| ||||||
15ft. (4.6m) location below Liebert XDC unit. |
|
| Liebert XDC and Liebert condenser. | ||||
8. Do not run piping or wiring in the path of air flow |
| 6 | Condenser legs - (8) eight legs for (4) | ||||
because this will reduce system performance. |
| 7 |
| ||||
9. Install |
|
| |||||
|
| a. Insulated storage receiver - storage | |||||
gas lines between condenser and field piping. |
|
| |||||
10. All other piping |
|
| receiver (1) per circuit. | ||||
11. Inverted traps must be installed to allow proper |
|
| is standard. |
| |||
clearance to fully open condenser control box door |
|
| b. Dual head pressure control valve assembly | ||||
and in accordance with local electric codes. |
|
| |||||
|
| with integral check valve(s) - (1) one per circuit (See Note 13) | |||||
12. Secure |
| ||||||
condenser frame using hardware provided. Receiver |
| c. Rotalock valve - (1) one per circuit | |||||
can be mounted on either side of the condenser. |
|
| d. Pressure relief valve - (1) one per circuit, | ||||
13. |
|
| e. Liquid level indicator - (1) per circuit, | ||||
assembly shipped loose for field installation. |
|
| |||||
|
| on receiver |
| ||||
Item C is shipped loose for field installation. |
|
|
| ||||
14. Fasten liquid and hot gas lines using flat surface |
| 8 | Bolts - | ||||
clamps with isolators |
|
|
|
|
| ||
field piping separately to avoid coil damage and |
|
|
|
| DPN000937 | ||
loss of charge |
|
|
|
|
| ||
15. Relieve pressure at access port. Replace access port |
|
|
| Pg. 01, Rev. 09 | |||
|
| For CSL616 condenser piping | |||||
fitting with relief valve before charging system. |
|
|
| ||||
|
|
|
|
| connections, see Figures 28 and 29. |
24