System Power Up/Down and Reset Settings

Power-Up/Down Sequence Requirements

6 System Power Up/Down and Reset Settings

This section provides information about the device power-up/down sequence and configuration at reset.

6.1Power-Up/Down Sequence Requirements

6.1.1Power-Up Sequence Requirements

These guidelines must be applied to meet the 88F6281 device power-up requirements:

„The non-core voltages (I/O and Analog) as listed in Table 31 must reach 70% of their voltage level before the core voltages reach 70% of their voltage level.

The order of the power-up sequence between the non-core voltages is unimportant so long as the non-core voltages power up before the core voltages reach 70% of their voltage level (shown in Figure 2).

The order of the power-up sequence between the core voltages (VDD and VDD_CPU) is unimportant.

„The reset signal(s) must be asserted before the core voltages reach 70% of their voltage level (shown in Figure 2).

„The reference clock(s) inputs must toggle with their respective voltage levels before the core voltages reach 70% of their voltage level (shown in Figure 2).

„If VHV is set to burning mode (2.5V), which is a higher voltage than the VDD voltage, VDD must be powered before VHV, to prevent the fuse from being accidentally burned.

Table 31: I/O and Core Voltages

 

Non-Core Voltages

Core Voltages

 

 

 

 

I/O Voltages

 

Analog Power Supplies

 

 

 

 

 

VDD_GE_A

 

CPU_PLL_AVDD

VDD

VDD_GE_B

 

CORE_PLL_AVDD

VDD_CPU

VDD_M

 

PEX_AVDD

 

VDDO

 

RTC_AVDD

 

 

 

SATA0_AVDD

 

 

 

SATA1_AVDD

 

 

 

SSCG_AVDD

 

 

 

XTAL_AVDD

 

 

 

USB_AVDD

 

 

 

 

 

Copyright © 2008 Marvell

 

Doc. No. MV-S104859-U0 Rev. E

December 2, 2008, Preliminary

Document Classification: Proprietary Information

Page 63

Page 63
Image 63
Marvel Group 88F6281 System Power Up/Down and Reset Settings, Power-Up/Down Sequence Requirements, O and Core Voltages