![TABLE OF CONTENTS](/images/new-backgrounds/62308/623085x1.webp)
TABLE OF CONTENTS
|
|
| page |
| 4 | ||
I. | OVEN USES | 4 | |
II. | OVEN COMPONENTS | 4 | |
| A. | Crumb Pans | 4 |
| B. | Conveyor Drive Motor | 4 |
| C. | Conveyor | 4 |
| D. | End Plugs | 4 |
| E. | Serial Plate | 4 |
| F. | Window | 4 |
| G. | Machinery Compartment Access Panel | 4 |
| H. | Control Compartment Access Panel | 4 |
| I. | Control Panel | 4 |
| J. | Eyebrows | 4 |
| K. | Conveyor End Stop | 4 |
| L. | Gas Burner | 4 |
| M. | Blowers | 4 |
| N. | Air Fingers | 4 |
III. | OVEN SPECIFICATIONS | 4 | |
| A. | Dimensions | 4 |
| B. | General Specifications | 5 |
| C. | Gas Orifice and Pressure Specifications | 5 |
| D. | Electrical Specifications - Gas Ovens | 5 |
| E. | Electrical Specifications - Electric Ovens | 5 |
SECTION 2 | 6 | ||
I. | INSTALLATION KIT | 7 | |
| A. | Components | 7 |
| B. | Additional Components - Gas Ovens | 7 |
| C. | Additional Components - Tandem Ovens | 7 |
II. | VENTILATION SYSTEM | 8 | |
| A. | Requirements | 8 |
| B. | Recommendations | 8 |
| C. | Other Ventilation Concerns | 8 |
III. | ASSEMBLY | 9 | |
| A. | Stacking | 9 |
| B. | Stands | 9 |
|
|
| page | |
IV. | THERMOCOUPLE INSTALLATION | 9 | ||
V. | TANDEM OVEN ASSEMBLY | 10 | ||
VI. | CONVEYOR INSTALLATION | 12 | ||
| A. | All | 12 | |
| B. | Tandem Oven Models | 13 | |
VII. FINAL ASSEMBLY | ................................................... | 13 | ||
VIII. ELECTRICAL SUPPLY | 14 | |||
| A. | Electric Ovens | 14 | |
| B. | Gas Ovens | 14 | |
| C. | Ovens with External Transformers | 14 | |
| D. | Connection | 14 | |
IX. | GAS SUPPLY | 15 | ||
| A. | Gas Utility | 15 | |
| B. | Connection | 15 | |
| C. | Gas Conversion | 15 | |
SECTION 3 - OPERATION | 16 | |||
I. | LOCATION AND DESCRIPTION OF CONTROLS .. | 16 | ||
| A. | BLOWER ( | ) Switch | 16 |
| B. | HEAT ( ) Switch | 16 | |
| C. | CONVEYOR ( | ) Switch | 16 |
| D. | Conveyor Speed Controller | 16 | |
| E. | Digital Temperature Controller | 16 | |
| F. | Machinery Cpt. Access Panel Safety Switch .... | 16 | |
II. | NORMAL OPERATION, | 17 | ||
| A. | Daily Startup Procedures | 17 | |
| B. | Daily Shutdown Procedures | 17 |
III.QUICK REFERENCE: DIGITAL TEMP CONTROL . 18
IV. QUICK REFERENCE: TROUBLESHOOTING | 19 | |
| 20 | |
I. | MAINTENANCE - DAILY | 21 |
II. | MAINTENANCE - MONTHLY | 22 |
III. | MAINTENANCE - EVERY 3 MONTHS | 23 |
IV. | MAINTENANCE - EVERY 6 MONTHS | 23 |
V. | KEY SPARE PARTS KIT | 24 |
ENGLISH
3