Installing an MG 1000B Core 223
Tools checklist
Toinstall the system correctly, make sure that the tools listed in Ta ble
21 "Toolschecklist" (page 223) are available before assembling the
components.
Table 2 1
Toolschecklist
Tools and components ü
screwdrivers
an ECOS 1023 POW-R-MATE or similar type of test meter
appropriate cable terminating tools
a drill for making lead holes
a computer forconnecting directly to the MG 1000B Core by a DTE—DTE
null modem cable, with:
teletype terminal (ANSI-W emulation, serial port, 19 200 bps) for the
Call Server, MG 1000B Core, Signaling Server, and Media Cards
a web browser for Element Manager and NRS Management
(configure cache settings to check for new pages every time and to
empty the cache when the browser is closed)
Rack-mounting an MG 1000B Core or MG 1000B ExpanderItems required
Toinstall each MG 1000B Core or MG 1000B Expander in a 19-inch rack,
use the following items:
equipment layout plan (discussed in Communication Server 1000E:
Installation and Configuration (NN43041-310))
one pair of left and right guide brackets
one pair of left and right ear brackets
eight #12-24 screws
four #8-32 machine screws
The NTTK09 kit contains all of the above items with the exception of the
equipment layout plan and screws.
Procedure 13
Mounting the MG 1000B Core or MG 1000B Expander in a 19-inch rack
Step Action
References to "MG 1000B Core" in the following steps also apply to the
MG 1000B Expander.