238 MG 1000B platform hardware installation
Figure 86
Signaling Server indicators and power switch
The Signaling Server LED indicators show the following:
Power– green LED on, power on; LED off, power off.
Status – red LED off, CPU running; LED on, CPU halted.
Drive – green LED flashing, Hard Drive or CD ROM Drive
active.
Link – green LED, Ethernet port active.
100Mbps – green LED on, Ethernet port running at 100Mbps;
LED off, Ethernet port running at 10Mbps.
When the power is turned off on a Signaling Server, the twoLink
LEDs for Port 0 and Port 1 continueto flash. Depress the Power
button for approximately sevenseconds to completely tur n the
power off.
6For additional operating information, refer to the Signaling Server
Product Guide on the Resource CD-ROMshipped with the Signaling
Server.
—End—
Toinstall the Signaling Ser ver software,see "Signaling Ser ver software
installation" (page 239).
Nortel Communication Server 1000
Branch Office Installation and Commissioning
NN43001-314 01.02 Standard
Release 5.0 20 June 2007
Copyright© 2007, Nor tel Networks
.