230 MG 1000B platform hardware installation
Preparing for rack-mounting
Procedure 14
Preparing the Signaling Server for rack-mounting
Step Action
The Front Mount Bracket assemblyis not intended for use as a slide rail
system. The Signaling Server must be firmly attached to the rack.
1Make sure the Signaling Server is not plugged into an electrical
outlet.
2Align the end of the rail (A in Figure 75 "Signaling Server brackets
(two of each)" (page 229)) with the flange (B in Figure 76 "Signaling
Server support bracket" (page 230)) toward the back of the Signaling
Server. See Figure 76 "Signaling Server support bracket" (page
230).
Figure 76
Signaling Server support bracket
3Align the screw holes in the rack-mount railwith the mating holes in
the side of the Signaling Server. Use three screws (C) on each side.
Hand-tighten the screws to prevent cross-threading then use a
Phillips screwdriver to secure them.
4Attach the bezel door to the faceplate of the Signaling Server, as
shown in Figure 77 "Left hinge mount" (page 231) and Figure 78
"Right hinge mount" (page 231).