P902 Watchdog

Press ENTER to put the CPU into an infinite loop to test the watchdog timer.

On successful completion (10 seconds) the RUN mode is entered and the SITRANS LU01 is reset. Programming is kept and the unit responds as if there had been a power failure.

P903 Display

Press ENTER to activate the display test.

All LCD segments and symbols are temporarily displayed.

P904 Keypad

Press ENTER , then press each keypad key in the following sequence:

1

2

3

4

5

6

7

8

9

0

 

 

 

 

mA

 

 

 

 

P P

As each key is pressed, the associated keypad number is displayed. On successful test completion, PASS is displayed. FAIL is displayed if a key is pressed out of sequence or the programmer keypad malfunctions.

P905 Transmit Pulse

Used to monitor the transmit pulse with an oscilloscope connected to the transducer terminals.

Values

Range: 10 to 60 kHz

 

 

 

Altered By

P004 Transducer

 

 

 

Press ENTER to supply repeated transmit pulses, at the frequency entered, to the transducer and / or view the transducer operating frequency (automatically altered by P004 Transducer) for the Point Number displayed.

P906 Communications

Note: Before activating this feature, connect terminal block contacts 27 to 29 and 28 to 30.

Press ENTER to test the SITRANS LU01 communications circuitry.

On successful completion, PASS is displayed. Otherwise FAIL is displayed. If FAIL is displayed, repeate the test (the first test performed sets up the auto polarity function).

Parameters

7ML19985BE02

SITRANS LU01 – INSTRUCTION MANUAL

Page 81

Page 87
Image 87
Siemens LU01 instruction manual P902 Watchdog, P903 Display, P904 Keypad, P905 Transmit Pulse, P906 Communications

LU01 specifications

The Siemens LU01 is a state-of-the-art train control and signaling system designed to enhance the safety and efficiency of rail networks. This sophisticated system leverages advanced technologies and innovative features to ensure seamless train operations, lower maintenance costs, and improved overall performance.

One of the main features of the Siemens LU01 is its implementation of the European Train Control System (ETCS). ETCS is a vital component in modernizing rail infrastructure across Europe, aiming to standardize various train control systems for enhanced interoperability among different national networks. The LU01 facilitates the integration of ETCS Level 1 and Level 2, allowing for both trackside equipment and onboard systems to work in harmony to manage train movements effectively.

Additionally, the LU01 employs a decentralized architecture that enhances system reliability and minimizes downtime. This design means that it can operate even in the case of individual component failures, ensuring that train operations remain uninterrupted. Furthermore, the LU01 utilizes advanced diagnostic tools and predictive maintenance technologies to monitor system performance continuously. This proactive approach allows for early identification of potential issues and timely maintenance, which contributes to reducing operational costs.

Another critical characteristic of the Siemens LU01 is its capability for real-time data transmission. The system integrates wireless communication technologies, enabling constant connectivity between trains and control centers. This feature allows for real-time updates on train positions, speeds, and other critical operational data, thereby enhancing situational awareness for train operators and maintaining optimal schedules.

Moreover, the LU01 is designed to be compatible with existing rail infrastructure, ensuring a smooth transition for railway operators looking to upgrade their signaling systems without extensive overhauls. This adaptability makes it an appealing choice for both new projects and retrofitting existing rail networks.

In summary, the Siemens LU01 stands out for its cutting-edge features, including support for ETCS, decentralized architecture, real-time data communication, and compatibility with legacy systems. With these technologies and characteristics, the LU01 significantly contributes to the safety, efficiency, and sustainability of modern rail transport systems, making it a pivotal solution in the evolution of railway operations.