CHAPTER 3 INSTALLATION

3.1 GENERAL

This Chapter contains instructions for initial inspection, preparation for use and repackaging for shipment. Connection to PC, setting the communication port and linking GenesysTM power sup- plies are described in Chapter 7.

NOTE

GenesysTM power supplies generate magnetic fields, which might affect the operation of other instruments. If your equipment is susceptible to magnetic fields, do not position it adjacent to the power supply.

3.2 PREPARATION FOR USE

In order to be operational, the power supply must be connected to an appropriate AC source. The AC source voltage should be within the power supply specification. Do not apply power be- fore reading Section 3.6 and 3.7.

Table 3-1 below, describes the basic setup procedure. Follow the instructions in Table 3-1 in the sequence given to prepare the power supply for use.

Step no.

Item

Description

Reference

 

 

 

 

1

Inspection

Initial physical inspection of the power supply

Section 3.3

 

 

 

 

2

Installation

Installing the power supply,

Section 3.4

 

 

Ensuring adequate ventilation.

Section 3.5

 

 

 

 

3

AC source

AC source requirements

Section 3.6

 

 

Connecting the power supply to the AC source

Section 3.7

 

 

 

 

4

Test

Turn-on checkout procedure.

Section 3.8

 

 

 

 

5

Load connection

Wire size selection. Local/Remote sensing.

Section 3.9

 

 

Single or multiple loads.

 

 

 

 

 

6

Default setting

The power supply setting at shipment.

Section 7.2.1

 

 

 

 

Table 3-1: Basic setup procedure

3.3 INITIAL INSPECTIONS

Prior to shipment this power supply was inspected and found free of mechanical or electrical de- fects. Upon unpacking of the power supply, inspect for any damage, which may have occurred in transit.

The inspection should confirm that there is no exterior damage to the power supply such as bro- ken knobs or connectors and that the front panel and meters face are not scratched or cracked. Keep all packing material until the inspection has been completed. If damage is detected, file a claim with carrier immediately and notify the TDK-Lambda Americas Inc. sales or authorized ser- vice facility nearest you.