Toshiba RAV-SP1104ATZG-E Requirement, 152, ‡PMV coil 1. Detachment, Attachment, No. Part name

Models: RAV-SP1104ATZG-E RAV-SP1104ATZ-E RAV-SP1404ATZ-E RAV-SM804UT-E RAV-SP1404AT-E RAV-SP1404ATZG-E RAV-SP1104AT-E RAV-SM1104UT-E RAV-SM1404UT-E

1 162
Download 162 pages 56.34 Kb
Page 152
Image 152
‡PMV coil 1. Detachment

No. Part name

Procedure

Remarks

PMV coil 1. Detachment

1)

Carry out work of item 1 of .

Concave part

PMV main unit

 

 

2)

Turn the coil while pulling upward and then

 

 

 

remove the coil from the PMV main unit.

 

 

2. Attachment

 

 

1) Surely match the positioning projection of the coil with the concave part of PMV main unit and then fix it.

Positioning projection

PMV coil

ˆFan guard 1. Detachment

1)

Carry out works of item 1 of and work

Fan guard

Bell mouth

Discharge

 

 

port cabinet

 

of .

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

REQUIREMENT

 

 

 

 

 

 

 

 

 

 

To prevent scratch on the product, carry out

 

 

 

the work on cardboard, cloth, etc.

 

 

 

 

 

 

 

 

 

 

 

 

 

2)

Remove the discharge port cabinet and

 

 

 

 

then put on it so that the fan guard side

 

 

 

 

directs downward.

 

 

 

3)

Remove the hooking claws (8 positions) of

 

 

 

 

the fan guard.

 

 

 

 

 

 

 

 

Hooking claw

 

2.Attachment

1)Push the hooking claws (8 positions) with hands from the front side to fix the claws.

REQUIREMENT

Check that all the hooking claws are fixed at the specified positions.

– 152 –

Page 152
Image 152
Toshiba RAV-SP1104ATZG-E Requirement, 152, ‡PMV coil 1. Detachment, Attachment, ˆFan guard 1. Detachment, No. Part name