Toshiba RAV-SP1104AT-E, RAV-SM1404UT-E, RAV-SM1104UT-E Defrost control, Start of heating operation

Models: RAV-SP1104ATZG-E RAV-SP1104ATZ-E RAV-SP1404ATZ-E RAV-SM804UT-E RAV-SP1404AT-E RAV-SP1404ATZG-E RAV-SP1104AT-E RAV-SM1104UT-E RAV-SM1404UT-E

1 162
Download 162 pages 56.34 Kb
Page 65
Image 65
10.Defrost control

10.Defrost control

1)In heating operation, defrost operation is performed when TE sensor satisfies any condition in A zone to D zone.

2)During defrosting operation, it finishes if TE sensor continued 12°C or higher for 3 seconds or continued 7°C TE < 12°C for 1 minute.

The defrost operation also finishes when it continued for 10 minutes even if TE sensor temperature was 7°C or lower.

3)After defrost operation was reset, the compressor stopped for approx. 40 seconds and then the heating operation starts.

Start of heating operation

TE [˚C] 0

10

15

39 45

55

d

[min.]

–2

–5

A zone

–10

B zone

D zone

–23

 

C zone

The minimum TE value and To value between 10 and 15 minutes after heating operation has started are stored in memory as TE0 and To0, respectively.

 

In normal To

In abnormal To

 

 

 

A zone

When status (TE0 – TE) – (To0 – To) 3°C

When status (TE0 – TE) 3°C

continued for 20 seconds

continued for 20 seconds

 

 

 

 

B zone

When status (TE0 – TE) – (To0 – To) 2°C

When status (TE0 – TE) 2°C

continued for 20 seconds

continued for 20 seconds

 

 

 

 

C zone

When status (TE –23°C) continued for 20 seconds

 

 

 

D zone

When compressor operation status of TE < –2°C is calculated by d portion

 

 

 

4) The time of above d can be changed by

J805

J806

d

exchanging jumper [J805] and [J806] of the

 

 

 

 

 

150 minutes

outdoor control P.C. board.

¡

¡

Setting at shipment

(Setting at shipment: 150 minutes)

 

 

 

¡

×

90 minutes

 

 

×

¡

60 minutes

 

×

×

30 minutes

¡ : Short circuit, × : Open

– 65 –

Page 65
Image 65
Toshiba RAV-SP1104AT-E, RAV-SM1404UT-E, RAV-SM1104UT-E, RAV-SP1404ATZG-E Defrost control, Start of heating operation