4. Software Implementation of the Gateway
4.2.13. Using and Monitoring the TSX PBY 100 Coupler Configuration
After validating all the changes previously made, you may check the configuration of the TSX PBY 100 coupler, the
ÎTransfer the application from the PC to the PLC by running the “Transfer program…” option from the “PLC”
menu (or click on the button) and selecting “PC
ÎSwitch from the OFFLINE to the ONLINE mode by running the “Connect” option from the “PLC” menu (or
click on the button).
ÎInitialize and start the PLC application using the “Init…” and “Run…” options from the “PLC” menu.
ÎOpen the “Hardware configuration”
and the | TSX PBY 100 | board |
configuration. | Then, switch | from |
“Configuration” to “Debug” and select the line that corresponds to the LUFP7 gateway.
The content of the
4.2.14. Developing a Profibus-DP Application
The
37