4. Software Implementation of the Gateway
4.1. Introduction
This chapter gives an introduction to a quick implementation of the LUFP7 gateway, using its default configuration. All LUFP7 gateways ship
This
4.1.1. System Architecture
The default configuration for an LUFP7 gateway allows it to control, monitor and configure 8 TeSys U motor starters:
Configuration
PC
(PL7 PRO + SyCon)
490 NAE 911 00
Modbus
addresses
c d e f g
|
|
|
| |||||||||||
|
|
|
| master PLC | ||||||||||
|
|
| TSX 57353 v5.1 | |||||||||||
|
|
| + TSX PBY 100 | |||||||||||
|
|
|
|
| ||||||||||
|
|
|
| |||||||||||
|
|
| ||||||||||||
|
|
| (upstream network) | |||||||||||
|
|
| ||||||||||||
LUFP7 |
|
|
|
|
|
|
|
|
|
| ||||
|
|
|
|
|
|
|
|
|
|
| ||||
| Total of 8 | |||||||||||||
gateway | motor starters | |||||||||||||
|
|
| (TeSys U model) | |||||||||||
| h | i | j | |||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Modbus (downstream network)
LineConnection
terminationboxes
Please see chapter 2 Hardware Implementation of the LUFP7 Gateway, page 13, for the hardware implementation of the default configuration.
If you are using fewer than 8 TeSys U motor starters, you will need to adapt the gateway configuration using the
25