9600 Compressor Installation, Operation, and Maintenance
Table of Contents (continued)
Appendix A - Customer Support Information
Appendix B - Flow Diagram
Appendix C - Troubleshooting Procedures
Appendix D - Schematic
Figures
Figure | . | |
Figure | Compressor Dimensions | . |
Figure | . | |
Figure | Compressor Rear View Component Locations | . |
Figure | Compressor Connected to Multiple | |
Figure | Compressor Connected to Multiple |
Figure 2-1: Using the Shipping Carton Ramp . . . . . . . . . . . . . . . . . . . . . . . . . . 2-2
Figure 3-1: 9600 Compressor Installation Flowchart . . . . . . . . . . . . . . . . . . . . 3-2
Figure 3-2: 9600 Compressor Circuit Breaker Terminals (Cover Removed) . . 3-5
Figure 3-3: Connecting/Disconnecting Helium Flex Line Self
Sealing Couplings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-8
Figure 3-4: Single On-Board Cryopump Connections . . . . . . . . . . . . . . . . . . . 3-9
Figure 3-5: Single Cryo-Torr Cryopump Installation . . . . . . . . . . . . . . . . . . . 3-10
Figure 3-6: Recommended Multiple On-Board Cryopump or
Waterpump Installation (Splitter Box located at Process Tool) . . 3-12
Figure 3-7: Alternative Multiple On-Board Cryopump or Waterpump Installation (Splitter Box located at Compressor) . . . . . . . . . . . . . . . . . . . . . . . 3-13
Figure 3-8: Recommended Multiple Cryo-Torr Cryopump Installation . . . . . 3-15
Figure 3-9: Alternative Multiple Cryo-Torr Cryopump Installation . . . . . . . . 3-16
P/N 8040540 | 6 |