Middleby Marshall PS314SBI Operation, English, I.Location And Description Of Controls, Not Shown

Page 13
SECTION 3 - OPERATION

SECTION 3 - OPERATION

I.LOCATION AND DESCRIPTION OF CONTROLS

Fig. 3-1 - Control Panel

D.

Conveyor Speed

(or "I.LOCATION AND DESCRIPTION OF CONTROLS") controller

ENGLISH

A.

B.

C.

 

E.

"BLOWER"

"HEAT"

"CONVEYOR"

Digital Temperature

(or " ")

(or " ")

(or "

")

(or " ")

switch

 

switch

switch

 

 

 

 

controller

A."BLOWER" Switch: Turns the blowers and cooling fans on and off. The HEAT Switch has no effect unless the BLOWER Switch is in the “ON” position.

B."HEAT" Switch: Allows the gas burner to light.

Activation of the gas burner is determined by the settings on the Digital Temperature Controller.

C.NOT SHOWN: "CONVEYOR" Switch: Turns the conveyor drive motor on and off.

D.

E.

Conveyor Speed Controller: Adjusts and dis-

plays the bake time.

Digital Temperature Controller: Continuously monitors the oven temperature. Settings on the Digital Temperture Controller control the activa- tion of the gas burner.

NOT SHOWN:

F.Machinery Compartment Access Panel Safety Switch: Disconnects electrical power to the controls and the blow- ers when the machinery compartment access panel is opened. The panel should only be opened by authorized service personnel.

13

Image 13
Contents Model PS314SBI Gas and Electric Ovens INSTALLATIONOWNERS OPERATING MANUALENGLISH 24-HourService HotlineRetain This Manual For Future Reference ENGLISH TABLE OF CONTENTSpage pageOVEN SPECIFICATIONS SECTION 1 - DESCRIPTIONENGLISH I.OVEN USESSECTION 2 - INSTALLATION Fig. 2-1- Installation Kit I. INSTALLATION KITA.Installation kit components ENGLISHA.Legs/Casters Installation III. ASSEMBLYB.Restraint Cable Installation Fig. 2-4- Adjustable Legs and CastersV. CONVEYOR INSTALLATION IV. THERMOCOUPLE INSTALLATIONFigure 2-6- Thermocouple Installation Location Figure 2-9- Conveyor InstallationFigure 2-10- Drive Motor and Drive Chain ENGLISHFigure 2-11- Conveyor belt tension Figure 2-12- Master link orientationFigure 2-13- Final Assembly - Front VI. FINAL ASSEMBLYFigure 2-14- Final Assembly - Rear ENGLISHVII. ELECTRICAL SUPPLY all ovens ENGLISHVIII. GAS SUPPLY gas ovens only ENGLISHENGLISH SECTION 3 - OPERATIONI.LOCATION AND DESCRIPTION OF CONTROLS NOT SHOWNDAILYSTARTUPPROCEDURE + or + orII. NORMAL OPERATION - STEP-BY-STEP Display ENGLISHSYMPTOMPROBLEM V. QUICK REFERENCE TROUBLESHOOTINGSOLUTION ENGLISHENGLISH SECTION 4 - MAINTENANCEII. MAINTENANCE - MONTHLY I. MAINTENANCE - DAILYENGLISH FRONTIV. MAINTENANCE - EVERY 6 MONTHS III. MAINTENANCE - EVERY 3 MONTHSV. MAINTENANCE - EVERY 12 MONTHS ENGLISHENGLISH page machinery compartment or control compartmentFRANÇAIS page ESPAÑOL página 24-HourService HotlineFours électriques et à gaz, modèle PS314SBI MANUEL D’INSTALLATIONET D’UTILISATION ModèlesAVERTISSEMENT Service d’assistance téléphonique 24 heuresFRANÇAIS Conservez ce manuel pour référence ultérieureSECTION 2 -INSTALLATION TABLE DES MATIÈRESFRANÇAIS pageFRANÇAIS SECTION 1 - DESCRIPTIONII. COMPOSANTS DU FOUR - Figure SPÉCIFICATIONS DU FOURFRANÇAIS SECTION 2 - INSTALLATIONAVERTISSEMENT AVERTISSEMENTII. SYSTÈME DE VENTILATION I. TROUSSE DINSTALLATIONFRANÇAIS MISE EN GARDEIII. ASSEMBLAGE FRANÇAISV. INSTALLATION DU TRANSPORTEUR IV. INSTALLATION DU THERMOCOUPLEFigure 2-6- Point dinstallation du thermocouple Figure 2-9- Installation du transporteurFigure 2-10- Moteur dentraînement et chaîne REMARQUEdentraînement FRANÇAISVI. ASSEMBLAGE FINAL FRANÇAISFigure 2-13- Assemblage final - Avant Figure 2-14- Assemblage final - ArrièreFRANÇAIS MISE EN GARDEVII. ALIMENTATION EN ÉLECTRICITÉ tous les fours AVERTISSEMENTVIII. ALIMENTATION EN GAZ fours à gaz seulement FRANÇAISMISE EN GARDE AVERTISSEMENTI.EMPLACEMENT ET DESCRIPTION DES COMMANDES SECTION 3 - OPÉRATIONFRANÇAIS NON ILLUSTRÉII. OPÉRATION NORMALE - PAS-À-PAS + ou +MISE EN GARDE FRANÇAISTémoin OVERTEMP FRANÇAISFRANÇAIS SOLUTIONV. CONSULTATION RAPIDE DÉPANNAGE SYMPTÔMEFRANÇAIS SECTION 4 - ENTRETIENI. ENTRETIEN - QUOTIDIEN FRANÇAISMISE EN GARDE II. ENTRETIEN - MENSUELIII. ENTRETIEN - TRIMESTRIEL FRANÇAISIV. ENTRETIEN - SEMESTRIEL V. ENTRETIEN - ANNUELService dassistance téléphonique 24 heures du compartiment des composants ou de commande21 ESPAÑOL página ENGLISH pageMANUAL DE OPERACIÓN Hornos de Gas y Eléctricos Modelo PS314SBIDEL PROPIETARIO E INSTALACIÓNESPAÑOL AVISORetenga este Manual para referencia futura ESPAÑOL ÍNDICE DE MATERIASpágina páginaESPAÑOL SECCIÓN 1 - DESCRIPCIÓNI.USO DEL HORNO II.COMPONENTES DEL HORNO - VER FIGURAESPAÑOL SECCIÓN 2 - INSTALACIÓNAVISO AVISOII. SISTEMA DE VENTILACIÓN I. JUEGO DE INSTALACIÓNFig. 2-1- Juego de Instalación A.Componentes del juego de instalaciónIII. ENSAMBLADO C.Otros problemas de ventilaciónA.Instalación de las patas o ruedas B.Instalación del cable de sujeciónIV. INSTALACIÓN DEL TERMOPAR ESPAÑOLV. INSTALACIÓN DEL TRANSPORTADOR NOTANOTA ESPAÑOLFigura 2-11- Tensión de la banda de transporte Figura 2-12- Orientación del Eslabón MaestroVI. ENSAMBLADO FINAL ESPAÑOLFigura 2-13- Ensamblado final - Parte delantera Figura 2-14- Ensamblado final - Parte posteriorESPAÑOL PRECAUCIÓNVII. SUMINISTRO ELÉCTRICO todos los hornos AVISOVIII. SUMINISTRO DE GAS solamente hornos de gas ESPAÑOLPRECAUCIÓN AVISOESPAÑOL SECCIÓN 3 - OPERACIÓNI.UBICACIÓN Y DESCRIPCIÓN DE LOS CONTROLES NO MOSTRADOESPAÑOL + o + oII. OPERACIÓN NORMAL - PASO A PASO IMPORTANTE IMPORTANTELuz “SP LOCK” ESPAÑOLESPAÑOL PROBLEMAV. REFERENCIA RÁPIDA DIAGNÓSTICO DE AVERÍAS SÍNTOMAESPAÑOL SECCIÓN4-MANTENIMIENTOI. MANTENIMIENTO - DIARIO ESPAÑOLPRECAUCIÓN PARTE DELANTERAIII. MANTENIMIENTO - TRIMESTRAL ESPAÑOLIV. MANTENIMIENTO - SEMESTRAL V. MANTENIMIENTO - ANUALIMPORTANTE