3Com RMON-EMP-3 installation and operation guide Installing the RMON MultiProbe Module

Models: RMON-EMP-3

1 120
Download 120 pages 61.92 Kb
Page 33
Image 33
Installing the RMON MultiProbe Module

Installing the RMON MultiProbe Module

You do not need to power down the hub to install or remove the RMON MultiProbe Module. You can insert the module while the hub is operating (this is called a hot swap).

To install the RMON MultiProbe Module:

1.Properly ground yourself prior to handling the module.

For example, wear a static wrist guard or touch a grounded static mat prior to handling the module.

2.Locate an open slot in the hub. Remove a blank panel on the hub to expose a slot for the module, if necessary.

3.Insert the module into the board guides at the top and bottom of the slot and slide it into the hub by pressing firmly at the top and bottom of the faceplate. Make sure the connectors are well-seated into the backplane of the hub.

Once you install the module, it automatically begins self-diagnostics and initializes.

Installing the Module 2 - 5

Page 33
Image 33
3Com RMON-EMP-3 installation and operation guide Installing the RMON MultiProbe Module