Upgrading an Enterprise 3000 to CMS R3V9
●If the tool determines that the tape or tape drive are not operational, the system displays the following message:
Tape test | failed!! | Could not write and then read a file | ||
from the tape | at /dev/rmt/X. | |||
Check the | following items | for possible problems: | ||
Verify | the | tape | is not | |
Verify | the | correct type of tape is in the tape drive | ||
Verify | the | tape | is not | defective |
|
|
|
|
|
Make sure the tape is not
12.The CVUE tool next runs the CMS converter tool. The system displays the following message:
Admin data will be spooled to /dev/rmt/X
.
.
Converter completed successfully. <timestamp> Converter completed successfully.
13.The CVUE tool next checks to see if any of the ACD switch links use X.25. One of the following happens:
●If no X.25 switch links are found, the upgrade continues with Step 14.
●If at least one X.25 switch link is found, the system displays the following message:
CVUE found that some ACDs use X.25 for the switch link. If X.25 will continue to be used for ACD switch links after the upgrade, CMS R3V9 requires that the customer purchase a new license. If all switch links will be converted to TCP/IP after the upgrade, purchase of a new license is not required. To continue, enter
(y)if the customer agrees to purchase or has purchased a new X.25 license, or if the switch links will be converted to TCP/IP (entering (n) will stop the upgrade) (y/n):
If you answer y, the upgrade continues and the new X.25 license will be installed. If you answer n, the upgrade stops and you must resolve the license issue.
34 CentreVu CMS R3V9 Sun Enterprise 3000 Computer CVUE Instructions