5-86
Cisco MGX 8800/8900 Series Hardware Installation Guide
Releases 2 - 5.2, Part Number OL-4545-01, Rev. H0, May 2006
Chapter5 Installing the Cisco MGX Switch or Gateway
Installing the MGX 8950 Switch
Step3 Route the cable outside the cable management brackets, then insert the other end of the cable labeled
“PEM 1 J1” into the primary (bottom) PEM receptacle labelled “J1.”
Push the connector in to seat it
Step4 Tighten the captive screws firmly by hand.
Step5 Insert the connector labeled “Card Cage B1” into the card cage receptacle labeled “PSB 1.
Push the connector in to seat it.
Step6 Tighten the captive screws firmly by hand.
Step7 Insert the other end of the cable labeled “PEM 2 J1” into the secondary (top) PEM receptacle labeled
“J1.”
Step8 Tighten the captive screws firmly by hand.
Step9 Insert the connector labeled “Card Cage B2” into the card cage receptacle labeled “PSB 2.
Push the connector in to seat it.
Step10 Tighten the captive screws firmly by hand.
Step11 Insert t he other end of the cable labeled “PEM 2 J2” into the secondar y (top) PEM receptacle labeled
“J2.”
Push the connector in to seat it.
Step12 Tighten the captive screws firmly by hand.
Step13 Insert the connector labeled “Card Cage A2” into the card cage receptacle labeled “PSA 2.”
Push the connector in to seat it.
Step14 Tighten the captive screws firmly by hand.
Step15 Route ca ble outside the cable management system bra ckets, then insert the other end of the cable labeled
“PEM 1 J2” into the primary (lower) PEM receptacle labeled “J2.”