Crane Merchandising Systems 670, 678 Hot Drink Setup/Programming Guide, Adjust the Air Pressure

Models: 678 670

1 141
Download 141 pages 50.45 Kb
Page 38
Image 38
3. Adjust the Air Pressure.

HOT DRINK SETUP/PROGRAMMING GUIDE

3. Adjust the Air Pressure.

This control determines the system pressure provided by the air compressor. Adjust as follows:

a.With the compressor running, pinch the brewer inlet air tube.

b.Adjust the pressure to read 10 - 12 psi on the gauge.

PRESSURE

GAUGE

MONETARY PANEL

This will produce a pressure of 3 - 6 psi using regular coffee and 8¼ oz cups. No further air

pressure adjustments should be necessary.

4. Install Canisters. INCREASE

PRESSURE

ADJUST

CONTROL

INGREDIENTS SHELF

4. Install Canisters.

1.Place the canister in position as shown.

2.Engage the pins on the motor shaft with the slots in the canister coupler.

3.Fit tabs on canister into the slots on the canister shelf.

4.To ensure canister is correctly engaged with the rear mounting bracket, gently push down on the front edge of the canister lid.

PINS ON MOTOR SHAFT MUST ENGAGE SLOTS IN CANISTER

FILLCOUPLER CANISTER

626P0017

CANISTER

SHELF

November, 2002

Page - 20

6700001

Page 38
Image 38
Crane Merchandising Systems 670, 678 manual Hot Drink Setup/Programming Guide, Adjust the Air Pressure, Install Canisters