Rack installation/removal of server

Hardware installation

You must ensure that the safety mechanisms on the server, e.g. stoppers or retaining systems, are functioning correctly.

The shape of the rack support uprights must ensure that the support systems can be bolted to the front.

The support systems have a linear alignment feature to ensure that they can be adjusted to different rack depths.

No cable management support (delivered with the mounting kit).

Climatic conditions:

An unobstructed air intake in the rack front and air discharge in the rear cover of the rack are essential for ventilation of the installed server.

In general, the ventilation concept ensures that the necessary cooling is achieved by the horizontal self-ventilation of the installed devices (air flow from the front to the rear).

Power supply:

For installation in 3rd party racks, you must ensure that the appropriate socket strips are present.

4.2.2Installation in PRIMECENTER/DataCenter rack

For installation in a PRIMECENTER/DataCenter rack, the following parts are required:

Support bracket

One support system on the left and one on the right

M5 centering fixtures (screws with integrated plugwashers)

I– The descriptions and figures in this section refer to the current support system. For other support systems you will find the appropriate description in the packaging of the rack mounting kit. For information on mounting of the rails in the 19-inch standard rack (for the Japanese market) please refer to the "Rack mount guide".

General information regarding server installation in the rack is included in the technical manual for the appropriate rack.

For information on mounting of the server in the 19-inch standard rack (for the Japanese market) please refer to the Rack mount guide.

46

Operating Manual

RX600 S5

Page 46
Image 46
Fujitsu RX600 S5 manual Installation in PRIMECENTER/DataCenter rack