Connecting the server to the mains

Hardware installation

Installation requirements for AC non redundant configurations

For systems not requiring AC redundancy, the power supply subsystem can be installed with up to 4 PSUs. The PSUs can be connected to a single or multiple AC sources.

PSU Configuration

Max. DC Loading

DC Redundancy

 

 

 

1+1 (2 PSUs)

830W

Yes

 

 

 

2+1 (3 PSUs)

1580W

Yes

 

 

 

3+1 (4 PSUs)

2320W

Yes

 

 

 

Table 3: Maximum DC Loading Requirements

Three power supply modules are capable of handling the maximum power requirements for a fully configured PRIMERGY RX600 S5 server system, which include the following:

Four processors

1024 GB of memory

Eleven PCIe add-in cards (including the SAS/SATA RAID controller card)

Eight hard disk drives

One optical drive

One tape drive

The hot swap feature allows the user to replace a failed power supply module without affecting the system functionality.

56

Operating Manual

RX600 S5

Page 56
Image 56
Fujitsu RX600 S5 manual Connecting the server to the mains