Hardware installation

Rack installation/removal of server

ÊInsert (3) the safety lock into the easy lock (snap fit).

VCAUTION!

Ensure that the safety lock has been inserted before the server is inserted!

ÊRepeat the above steps for the right-hand support system (with the front and rear right support uprights).

ÊFit the PRIMECENTER/DataCenter rack cable management as described in the Technical Manual for the corresponding rack.

11

 

11

12

8

4

1

Figure 5: Position of the cage nuts

ÊFit the cage nuts for securing the server in the corresponding catches on the right and left support uprights.

ÊInsert the server (see "Inserting the server" on page 50).

RX600 S5

Operating Manual

49

Page 49
Image 49
Fujitsu RX600 S5 manual Vcaution