Hardware installation | Rack installation/removal of server |
ÊInsert (3) the safety lock into the easy lock (snap fit).
VCAUTION!
Ensure that the safety lock has been inserted before the server is inserted!
ÊRepeat the above steps for the
ÊFit the PRIMECENTER/DataCenter rack cable management as described in the Technical Manual for the corresponding rack.
11 |
| 11 |
12
8
4
1
Figure 5: Position of the cage nuts
ÊFit the cage nuts for securing the server in the corresponding catches on the right and left support uprights.
ÊInsert the server (see "Inserting the server" on page 50).
RX600 S5 | Operating Manual | 49 |