Table 4: Wire Requirements

Note

Insert the top left screw as far as possible into the wall, leaving enough room to hang the panel on it. After the panel is hung, you will be unable to tighten this screw.

Table 3: Minimum Device Current Draw

 

Device

Min. mA Draw

 

 

 

SuperBus 2000

Automation Module

30 mA

 

 

 

SuperBus 2000

Transceiver Module

50 mA

 

 

 

SuperBus 2000

Wireless Gateway Module

55 mA

 

 

 

Interrogator 200

 

10 mA

 

 

Interrogator AVM

45 mA

 

 

 

After determining panel location, run all necessary wires to that location using the guidelines in Table 4.

Table 4: Wire Requirements

 

 

Device

Wire Requirements

 

 

AC Power Transformer

2-conductor, 18-gauge, 25 feet max

 

 

Earth Ground

Single conductor, 16-gauge solid, 25 feet max

 

 

Telephone (RJ-31X)

4-conductor

 

 

Detection Devices

2- or 4-conductor, 18- to 22-gauge, 300-ohms

max loop resistance including device

 

 

 

Speakers

2-conductor, 22-gauge, 175 feet max

2-conductor, 18-gauge, 440 feet max

 

 

 

SuperBus 2000 Devices

4-conductor, 22- or 18-gauge

 

 

Interrogator 200 AVM Power and Microphone

4-conductor, 22-gauge, shielded

 

 

 

2-conductor, 22-gauge, 330 feet max

2-Wire Smoke Detectors

2-conductor, 18-gauge, 830 feet max

(based on 10-ohms max loop resistance plus

 

 

a 2k-ohm, end-of-line resistor)

 

 

Mounting the Panel

Use the following procedure to mount the panel to the wall or wall studs.

Make sure you are free of static electricity whenever you work on the panel with the cover

!open. To discharge any static, first touch the metal panel chassis, then stay in contact with the chassis when touching the circuit board. Using an approved grounding strap is recom- mended.

Caution

￿To mount the panel:

1.Open the panel door and remove the necessary wiring knockouts (see Figure 2). Be careful not to damage the circuit board.

2.Feed all wires through wiring knockouts and place the panel in position against the wall.

3.Level the panel and mark the top right and bottom mounting holes (see Figure 2). You will be unable to mark the top left mounting hole.

4.Make a level mark 10 inches to the left of the top right mounting mark. This will be the posi- tion of the top left mounting screw.

5.Install anchors where studs are not present.

6.Partially insert screws into the two top mounting hole locations, then hang the panel on the two screws.

7.Recheck for level, insert the two lower screws, and tighten the top right and lower mounting screws.

Concord Ultra

8

Page 13
Image 13
GE 60-960-95 installation instructions Mounting the Panel, Minimum Device Current Draw, Wire Requirements