GE 60-960-95 Connecting the Panel to Earth Ground, Installing Optional SnapCards, Concord Ultra

Models: 60-960-95

1 104
Download 104 pages 42.3 Kb
Page 15
Image 15
Figure 4. Installing the Antennas

Note

For best results, it is recom- mended that you crimp a spade lug on the wire end at the panel and secure the lug under the circuit board screw as shown in Figure 5.

Connect

To Inside

Terminals

ID:XXXXXXXX

Transceiver

Figure 4. Installing the Antennas

Connecting the Panel to Earth Ground

For maximum protection from lightning strikes and transients, connect the lower-left circuit board screw to earth ground as shown in Figure 5. Use 16-gauge, solid copper wire from an earth grounded cold water pipe clamp to the panel.

 

ID:XXXXXXXX

Transceiver

 

To Water Pipe

Panel

 

Circuit

 

Board

Note

Figure 6 shows the control panel without the transceiver and its mounting brackets.

Pipe

Ground Clamp

Figure 5. Connecting the Panel to Earth Ground

Installing Optional SnapCards

The SnapCard Header on the right side of the panel allows for the installation of one SnapCard. Install the desired SnapCard onto the panel SnapCard Header and secure it in place with two screws, included with the card (see Figure 6).

Connect all necessary input/output wiring using the Installation Instructions included with the SnapCard.

Connector

SnapCard

SnapCard

Header

Screw Locations

Figure 6. Installing a SnapCard

Concord Ultra

10

Page 15
Image 15
GE 60-960-95 Connecting the Panel to Earth Ground, Installing Optional SnapCards, Installing the Antennas, Concord Ultra