Removing the Paper Guide Assembly

Figure A-12 Wire Routing and Upper Switchback Guide Screw

1 Remove the (4) screws shown in Figure A-11, callout 2. 2 Lift the switchback assembly and clear the wires.

3 Remove the assembly.

N o t e : When re-assembling, verify proper wire routing as shown in Figure A-12, callout 1.

A -16 Duplexer