Leader Block Inspection

See Figure 23 to inspect the tape in the leader block.

A 1 4 0 0 2 1 4

Figure 23. Leader Block Installment Procedure

The following lists the components required for installation of the leader block:

Incorrectly Installed Tape on a Leader Block

Correctly Installed Tape on a Leader Block

Incorrectly Installed Tape on a Leader Block

Leader Block

Insert Pin

Tape

Figure 23 shows a correctly installed leader block in item . The tape and insert alignment in the leader block are critical for correctly loading the tape into the tape drive subsystem. The tape is centered over the leader block.

There will be a 1.9 millimeters (0.075 inch) gap on both sides of the leader block with proper tape and insert pin installation. Center both the tape (see

item

) and the insert pin (see item

) over the leader block (see item

). Incorrectly installed leader blocks (see items

and

) will cause

damage to the tape drive and to the tape.

 

 

Using Non-IBM Cartridges

For maximum performance, use IBM tape cartridges with IBM tape subsystems.

IBM will charge the customer for time and material of certain required service and parts. Those are, the use of non-IBM cartridges which cause machine damage, machine service calls, or parts replacement (other than that which is caused from normal wear).

Chapter 8. Cartridge Care and Handling 93

Page 113
Image 113
IBM 3590 manual Leader Block Inspection, Using Non-IBM Cartridges, See to inspect the tape in the leader block