Preinstallation steps (all bays)

Preinstallation steps (all bays)

Before you install drives in the server, verify that you have all the cables and other equipment specified in the documentation that comes with the drive. You might also need to perform certain preinstallation activities. Some of the steps are required only during the initial installation of an option.

1.Read “Safety information” on page 105 and the documentation that comes with your drive.

2.Choose the bay in which you want to install the drive.

3.Check the instructions that come with the drive to see if you need to set any switches or jumpers on the drive. If you are installing a SCSI device, be sure to set the SCSI ID for that device.

Installing a drive in bay 2 or 4

Note: The EMI integrity and cooling of the server are both protected by having the bays covered or occupied. When you install a drive, save the filler panel and EMC shield from the bay, in case you later remove the drive and do not replace it with another.

EMC shield

Filler panel

Complete the following steps to install a drive in bay 2 or 4:

1.Read the information in “Preinstallation steps (all bays)”.

2.Turn off the server and peripheral devices and disconnect external cables and power cords; then, remove the side cover (see “Removing the side cover” on page 40 for details).

3.Remove the support bracket assembly and disconnect the fan cable from the connector (SYSFA3) on the system board. See “Removing the support bracket