Preparing the site . . . . . . . . . . . . . . . . . . . . . . . 19

Preparing the rack cabinet

. .

. .

. . .

.

.

19

Installing the DS4100

. .

. .

. . .

.

.

20

Rack mounting template

. .

. .

. . .

.

.

20

Installing the support rails

. . . . . . . . . 22

Removing the CRUs . . . . . . . . . . . . . . . . . . . . . . 25

Removing a RAID controller

. .

. .

. . .

.

.

25

Removing a power supply

. .

. .

. . .

.

.

26

Removing a fan

. .

. .

. . .

.

.

27

Removing a hard disk drive

. .

. .

. . .

.

.

28

Installing the DS4100 into a rack cabinet

. .

. .

. . .

.

.

28

Replacing the DS4100 CRUs

. .

. .

. . .

.

.

29

Replacing a RAID controller

. .

. .

. . .

.

.

30

Replacing a power supply

. . . . . . . . . 30

Replacing a fan. . . . . . . . . . . . . . . . . . . . . . . 31

Replacing a hard disk drive

. .

. .

. . .

.

.

32

Setting the interface options

. .

. .

. . .

.

.

32

Fibre channel loop and ID settings

. .

. .

. . .

.

.

33

Server ID (enclosure ID) settings

. .

. .

. . .

.

.

33

Storage server speed settings

. .

. .

. . .

.

.

34

Configuring the storage subsystem

. .

. .

. . .

.

.

34

Storage subsystem management methods

. .

. .

. . .

.

.

34

Host-agent(in-band) management method. . . .

. .

. .

. . .

.

.

34

Direct (out-of-band) management method . . . .

. .

. .

. . .

.

.

35

Fibre channel connections. . . . . . . . . . . . . . . . . . . . 36

Fibre channel loop configurations

. . . . . . . . . .

.

36

Redundant host and drive loops

. . . . . . . . . .

.

37

Installing the storage subsystem configuration

. . . . . . . . . .

.

42

Chapter 3. Cabling the storage server . . . .

. . . . . . . . . .

.

45

Working with SFPs and fiber-optic cables . . . .

. . . . . . . . . .

.

45

Handling fiber-optic cables

. . . . . . . . . .

.

45

Installing SFP modules . . . . . . . . . . . . . . . . . . . . . 46

Removing SFP modules

.

.

48

Installing fiber-optic cables

.

.

48

Using LC-LCfibre-channel cables

.

.

49

Connecting an LC-LC cable to an SFP module

.

.

50

Removing an LC-LCfibre-channel cable

.

.

51

Using LC-SCfibre-channel cable adapters

.

.

52

Connecting an LC-SC cable adapter to a device

.

.

53

Removing an LC-LC cable from an LC-SC cable adapter

.

.

54

Connecting hosts to the RAID controllers

.

.

55

Connecting hosts to a DS4100 base storage server

.

.

55

Connecting hosts to a DS4100 single-controller storage server . . . .

.

.

56

Connecting secondary interface cables

.

.

56

Connecting secondary interface cables to a DS4100 base storage server

 

 

57

Connecting secondary interface cables to a DS4100 single-controller storage server . . . . . . . . . . . . . . . . . . . . . . . . . . 57

Connecting expansion units (base storage server only) . . . . . . . . . . 57 DS4000 EXP100 loop redundancy (DS4100 base storage server only) . . . 59 Power cabling . . . . . . . . . . . . . . . . . . . . . . . . . 61

Installing the DS4000 Storage Manager client

. . . . . .

. . . .

.

.

.

62

Chapter 4. Operating the storage server. .

. . . . . .

. . . .

.

.

.

65

Turning the storage server on and off . . .

. . . . . .

. . . .

.

.

.

65

Turning on the storage server

. . . . . .

. . . .

.

.

.

66

xIBM TotalStorage DS4100 Storage Server: Installation, User’s, and Maintenance Guide

Page 12
Image 12
IBM Partner Pavilion DS4100 manual Cabling the storage server, Operating the storage server