7. Monitoring and Troubleshooting

Table 7-1. Health and Status Messages (4 of 4)

Message

What Message Indicates

What To Do

 

 

 

 

Primary Clock Failed,

A failure has occurred in the

1.

Verify that the network cable

Pt n

primary clock source for the

 

is securely attached at both

 

DSX-1 or G.703 port.

 

ends.

 

 

2.

Verify the clock configuration

 

 

 

on the unit and attached

 

 

 

equipment.

 

 

3.

Contact network provider.

 

 

 

Primary System Clock

A failure has occurred in the

Contact your service

Failed

clock common to all

representative.

 

cross-connect circuitry.

 

 

 

 

 

 

RAI at G.703,

An RAI (Remote Alarm

1.

Check the status of the

Pt n

Indication) signal is being

 

attached device.

 

received by the G.703

2.

Verify that the Line Coding,

 

interface.

 

 

Line Framing, and Time Slot

 

 

 

 

 

 

16 configuration options

 

 

 

selected are compatible with

 

 

 

the connected G.703

 

 

 

equipment’s configurations.

 

 

 

See G.703 Interface Options

 

 

 

(Model 8779) in Appendix A,

 

 

 

Configuration Options.

 

 

 

Secondary System

A failure has occurred in the

Contact your service

Clock Failed

fallback clock for the system

representative.

 

clock.

 

 

 

 

 

System Operational

There are no problems

No action is needed.

 

detected.

 

 

 

 

 

 

Yellow Alarm at

A Yellow Alarm Indication

1.

Verify that the unit’s line

DSX-1, Pt n

signal is being received by

 

framing and line coding are

 

the DSX-1 interface.

 

compatible.

 

 

2.

Contact network provider.

 

 

 

 

7-6

May 2002

8700-A2-GB20-40

Page 58
Image 58
Paradyne 8779, U8777 manual See G.703 Interface Options