Samson 5100, 5179 operating instructions Operation, 1.1Operating elements, Operating keys

Models: 5179 5100

1 142
Download 142 pages 31.78 Kb
Page 6
Image 6
Operation

Operation

1 Operation

The controller is ready for use with the temperatures and operating schedules preset by the manufacturer.

On start-up, the current time and date need to be set at the controller (–> section 1.5).

1.1Operating elements

The operating controls are located in the front panel of the controller and protected by a Plexi- glas door.

1.1.1 Operating keys

Changeover key

Press to switch between operating level and configuration/parameter level

Reset key

Press to reset accessible parameters to their default settings; the controller must be in the parameter level

Arrow keys

To scroll within levels

To change values

Enter key

To access levels

Access parameters and functions to edit them

Confirm settings

Display set points in info level

6EB 5179 EN

Page 6
Image 6
Samson 5100, 5179 operating instructions Operation, 1.1Operating elements, Operating keys