Changing part of a calculation

1.Move to the line you want to change using [PREV] .

2.Enter the new operator and value then press (m).

3.Press [m) again to get the new answer.

Deleting a line

1.Move to the line you want to delete using [m) .

2.Press (DEL) .

3.Press [ENTER) to get the new total.

DateUsing the Calc application, you can calculate the period calculation of time (in days) between two specific dates, and also

determine what the date will be a certain number of days before or after a specific date.

Calculating the number of days between two dates

1. Touch 1-j to call the date calculator.

The current date is the default starting date.

If you want the calculation to start from the current date, skip step 2 below.

Starting date

2.Touch 1 CANCEL 1 to clear the starting date field and enter the desired starting date. Prefix a single-digit month or date with a 0.

*/ You can also modify a specific part of a date by touching it, then entering the desired numbers.

3. Touch ml.

177

Page 178
Image 178
Sharp IQ-8900 manual Changing part of a calculation, Deleting a line, Calculating the number of days between two dates, 177