PARMLIB requirements
The following ENVCNTL parameter library entries are used by the DB2 Manager control region during table migration processing. It should be verified that these are set as required prior to the start of table migration processing. If not, they may be altered via the DB2 Manager ‘SET’ operator command (see page 58):
SMFRECID This parameter should be set to the identifier of the SMF records to be created by DB2 Manager during table migration processing, or set to 0 if no SMF recording is to take place.
OBJSIZE This parameter should be set (or defaulted) to control the maximum number of migrated rows to be stored per Archive Manager object during table migration processing. Note that the lower of the two values for the ENVCNTL OBJSIZE parameter and the SYSIN COMMIT parameter is used to determine the maximum number of migrated rows per Archive Manager object.
WRITETIMEOUT This parameter will control the length of time that a writer task will wait between receiving successive requests when updating an Archive Manager database. If no request is received when this time interval expires, the writer task will disconnect the Archive Manager database without committing updates. This will cause the current tape volume to be dismounted, and the database to be left in an “uncommitted” condition. A rerun of the table migration job will then be required with the execution parameter “RESTART=YES” specified.
Print reports
The table migration utility will write a number of print reports to the
SYSPRINT dataset during execution. These consist of:
•Parameter specification and validation report. This will contain a list of SYSIN parameters specified (or defaulted) for execution of the utility, and a validation error report if errors are detected in parameter specification. It will also specify the SQL migration selection statement coded in the SQLIN file.
•Execution report. Any errors or warning conditions encountered during execution of the utility will be identified in this report.
•Summary processing report. At end of processing, the utility will write the summary processing report which will identify the total number of table rows processed, and the total number migrated, up to the last successful commit point (for runs which do not terminate successfully) or up to end of processing (for successful runs).
86 | DB2 Manager User Guide |
| StorageTek Proprietary |