Sun Microsystems 3900, 6900 manual To Isolate the T1 or T2 Data Path

Models: 6900 3900

1 204
Download 204 pages 8.57 Kb
Page 114
Image 114

When you insert a loopback connector in to the T port, no green light appears to indicate a proper insertion. However, the test will run and be valid.

If only one of the links has failed and the I/O is traveling over the remaining link, I/O is automatically routed over the repaired link by the switch after the failed link is replaced and recabled. No manual intervention is required.

If both links have failed and a LUN failover has occurred, you must manually run a failbackt3path command to return the paths to their optimal state, after you repair and recable the links.

To Isolate the T1 or T2 Data Path

1.Run linktest from the Storage Automated Diagnostic Environment for a guided isolation procedure.

2.After replacing the failed FRU, run failbackt3path , if needed.

94 Sun StorEdge 3900 and 6900 Series 2.0 Troubleshooting Guide • March 2003

Sun Proprietary/Confidential: Internal Use Only

Page 114
Image 114
Sun Microsystems 3900, 6900 manual To Isolate the T1 or T2 Data Path, Sun Proprietary/Confidential Internal Use Only