2. Turning Power On / Shutdown

Turning power on

Open the switch cover, and then turn the power switch on.

1

The equipment starts warming-up. “Wait Warming Up” appears during warming-up.

While the equipment is warming up, you can use the auto job start function.

(

P.59 “3.Auto Job Start (Job Preset)”)

The equipment will be ready for copying after about 130 seconds and “READY” appears.

When controlling use of equipment with department codes

You can restrict users or manage copy volumes made by an individual group or department in your com- pany using the department codes. When the copy volume is controlled under the department code, enter the code after turning the power on. See the User Functions Guide for setting and registration of the department codes.

When the power is turned on, the following menu appears.

This menu also appears when the [ACCESS] button is pressed or the automatic function clear has worked.

Key in a registered department code (5 digits). The equipment will be ready for copying.

If the department code keyed in is incorrect, the menu does not change. In this case, press the [FUNC- TION CLEAR] button and then key in the correct code.

When copying is finished

When you finish all operations, press the [ACCESS] button to prevent unauthorized use of the equipment. The display returns to the department code input menu.

29

Page 31
Image 31
Toshiba 850, 720 Turning Power On / Shutdown, Turning power on, When controlling use of equipment with department codes