6 F 3 B 0 3 6 2

3. Preparing for Operation (Hardware)

This section presents the Ethernet Port setup.

WARNING

1.Build emergency stop, interlock, and similar circuits outside the PU235N/245N. If a breakdown or malfunction occurs in the PU235N/245N, there is the danger that someone could be hurt or fatally injured. Also, other equipment could be damaged or a breakdown could occur.

CAUTION

2.Take all necessary safety precautions before performing operations such as changing a running program, forcing output, or switching to RUN (operate) or HALT (stop) modes.

Equipment can be damaged and breakdowns can be caused by operating this equipment incorrectly.

26

Page 27
Image 27
Toshiba T2N instruction manual Preparing for Operation Hardware