Installation

Verifying the Installation

Verifying the Installation

You can verify the probe’s installation by looking at the status LEDs on the front or back of the probe. LEDs on the back of the probe show the status of each port and the LEDs on the front of the probe indicate the status of the 10Base-T/ 100Base-TX telemetry interface. After the probe restarts (boots), it runs a power- on self-test (POST) and then starts normal operations.

The Fault LED is briefly turned on (about three seconds) during the POST. After the probe passes the POST, the Fault LED turns off. The Activity LED flashes during network activity. The ~Line On or Power LED should be on to indicate that power is applied to the probe.

After the probe has passed its self-tests, look at the status LEDs to verify your installation. The status LEDs should be in the following states:

LED

State

Activity

Flashing, if connected to a network with traffic, or may

 

appear to stay on solid during periods of steady traffic.

~ Line On or Power

On solid

Fault

Off

You can use NetMetrix to verify that the probe can be reached (refer to your NetMetrix documentation).

68

Page 88
Image 88
Agilent Technologies J3916A manual Verifying the Installation, State